Jack pulls over for an oversize load

About an hour after leaving Prudhoe Bay, Jack meets a pilot car for an over-sized load so he stops at a pull-out and waits.  You’ll see the trucks in back of the big load go around it, then a truck that will be traveling faster than Jack goes ahead of him.

The big load is a 400,000 pound mod (modular unit) and there were four 70,000 pound push trucks to get it from Fairbanks to the last hill which is about 60 miles south of Prudhoe.  Only one push truck is needed to get it the rest of the way into Prudhoe and that’s the one you can see here.

(Your volume needs to be turned up on this one.)

Heavy haul load with 2 push trucks

For some reason, years ago, Jack documented this heavy haul load quite thoroughly so why not share it with you guys.  This is a 2006 heavy haul load with 2 push trucks going up Atigun Pass on the Dalton Highway, and coming down the other side.  The load might be some kind of heater, maybe to heat the oil going down the pipeline, but Jack’s not totally sure.  It’s an outside unit so didn’t need to be covered.  Click on the first one and scroll to the right.

Mod Lift at Alpine

Hard to believe this was 10 years ago, Jack says.  This is a mod lift at the Alpine oil fields (mod is short for modular), back when he was doing heavy haul.  Since it’s been so many years all he had to say about it was that he hauled this prefabricated unit to Alpine from Valdez and the workers there got busy lifting it off his truck.  It took all day actually.  That was one part of heavy haul he doesn’t miss.