Photos from a past hauling job

Here are some miscellaneous photos that Jack took a couple of years back at a marine dock in Valdez.  He was there in May of 2012, hauling items for the railroad bridge that’s now finished (although there aren’t tracks leading to or away from it).

Pipe Hammering Device

The above piece is part of the hammer used to drive pilings into the ground.  For bridge foundations in this case.

Pipe roller

This is used to put pipe on so it can roll while being welded together.

Miscellaneous items in marine yardThese are miscellaneous items  used on the bridge job.

Pipe rollerAnother pipe roller.

Piling Driving DeviceJack says this stands on end and the large circular piece drives down into the hole and onto a piling.

Piling driving deviceThis is the hammer that pounds a piling, Jack thinks it’s for 24 inch pipe.

The large circular device in back should be for the large pipe in the far background.

Miscellaneous marine yard items24 inch pipe in back of some other items.

Marine yard miscellaneous itemsSheet piling (which gets pounded into the ground to create an embankment) and miscellaneous steel items.

Six foot pipe in ValdezSix foot diameter pipe that most people can walk though without bending over.

Six Foot Diameter PipeMore six foot diameter pipe with shipping containers in the background.

I must say this marine yard is a tad more attractive than most, surrounded by beautiful mountains and all!

Have a wonderful day and thanks to those of you who follow this blog and make comments. 🙂

+++++++++++++++++++++++++

+++++++++++++++++++++++++

+++++++++++++++++++++++++

Advertisements

Hauling Pipe from Valdez to Salcha

This month Jack has been hauling huge pipe sections to Salcha, a small community about 35 miles from Fairbanks.  The State of Alaska is building a railroad bridge across the Tanana River in Salcha and these pieces are probably going to be standing supports with concrete poured inside.  Each driver manages to haul two sections a day, you can see them loaded here.  In back of the trucks and in front of the shipping containers there are stacks of more pipe that need to be hauled to Salcha, so Jack won’t be off this project for a while to come.  Yes, work means a paycheck, but ending up with one a a half days off a week is hard when you’ve got a home you want to take care of, and knowing there are only 3 months of summer in Fairbanks.


We’ll post more about this trip soon, so stay tuned and click “follow” if you are interested in getting an email each time a post is made here.